Design and engineer with the intelligent substation BIM authoring software according to ISO 19650
Integrate your engineering data
Integrate substation engineering data into your data environment and establish a single source of truth (SSoT)
Create a digital inventory of your substations
Digitalize your existing substations and establish a valid data foundation of your assets
The gateway to your digital twin
Visualize, review and share the VR-Model and Digital Twin of your substation across all departments and stakeholders to enable seamless collaboration
We have been able to act even more quickly since we introduced primtech. Shorter and shorter lead times have been possible, not just in marketing, but particularly in the design and construction cycle.
The accuracy and trust we have in primtech are unmatched. It ensures that what we plan is exactly what gets built.
With the OSR+PRO process, we save an average of 3-4 weeks per substation in the preliminary planning phase. That's really great.